Section 2: Operator Installation - Genie GCL-MT Manual

Trolley operator
Hide thumbs Also See for GCL-MT:
Table of Contents

Advertisement

The drawbar operator consists of the:
A. Operator
B. Drawbar Track
C. Chain Guides
D. Drawbar Arm
E. Front Spreader
F. Front Idler Sprocket
G. Drive Chain
H. Drive Sprocket
I. Carriage
A
NOTE: Drawbar tracks must be 29 inches longer than the door's height.
Tracks have been sized properly and pre-punched for the chain guide assemblies from the factory.
Sec-2.1

Section 2: Operator Installation

C
H
B
G
I
D
F
E

Advertisement

Table of Contents
loading

Table of Contents