Power On; Initialization - TP-Link JetStream T2500G-10MPS Installation Manual

Gigabit l2 managed switch
Hide thumbs Also See for JetStream T2500G-10MPS:
Table of Contents

Advertisement

Gigabit L2 Managed Switch

4.5 Power On

4.6 Initialization

Connection
18
Plug the female connector of the provided power cord into the power socket of the
device, and the male connector into a power outlet as the following figure shows.
Figure 4-5 Connecting to Power Supply
Note: The figure is to illustrate the application and principle. The power cord you get
from the package and the socket in your situation will comply with the regulation in
your country, so they may differ from the figure above.
After the device is powered on, it begins the Power-On Self-Test. A series of tests
run automatically to ensure the device functions properly. During this time, its LED
indicators will respond as follows:
The PWR LED indicator will light on all the time.
After keeping off for about one minute, the LED indicators of all the ports will flash
momentarily and then turn off again after the initialization.
The SYS LED indicator will flash, which represents a successful initialization.