Jackson AJ-64CGP Installation/Operation & Technical Manual page 47

Rack conveyor dishmachine
Hide thumbs Also See for AJ-64CGP:
Table of Contents

Advertisement

SECTION 2: INSTALLATION/OPERATION INSTRUCTIONS
TYPICAL RECIRCULATING WATER HOOK-UP FOR ALL GAS HEATED CONVEYORS
HOOKUP WHEN GAS BOOSTER HEATER
RIGHT
IS LOCATED TO THE
OF THE
DISHMACHINE
***C
*A
CONNECTION HOSES ARE CUT TO LENGTH DURING INSTALLATION.
**B
(ENOUGH HOSE IS PROVIDED TO LOCATE THE GAS BOOTER HEATER APPROXIMATELY 9 FEET
AWAY FROM THE DISHMACHINE. ADDITIONAL HOSE MUST BE ORDERED IF A GREATER DISTANCE
IS REQUIRED. DISTANCES GREATER THAN 20 FEET AWAY CAN AFFECT THE HEATING PERFORMANCE
OF THE UNIT)
*
HOSES MARKED
**
HOSES MARKED
***
C
ITEMS MARKED
GAS CONVEYOR HOSE INSTALLATION (CONTINUED)
A
IN THE ABOVE ILLUSTRATIONS CONNECT TO THE
B
IN THE ABOVE ILLUSTRATIONS CONNECT TO THE
ARE THE INCOMING PLUMBING CONNECTIONS TO MACHINE THAT SHOULD BE 110 - 140 DEGREES
***C
NOTE HOW THE 90 ELBOW SWITCHES TO THE
OPPOSITE SIDE OF THE PIPING TEE TO ACCOMMODATE
THE HOSE COMING FROM THE OPPOSITE DIRECTIONS
INLET
WATER CONNECTION OF THE GAS BOOSTER HEATER
OUTLET
WATER CONNECTION OF THE GAS BOOSTER HEATER
39
HOOKUP WHEN GAS BOOSTER HEATER
LEFT
IS LOCATED TO THE
OF THE
DISHMACHINE
*A
THE RINSE TANK INLET
PIPE IS ROTATED 180 TO
ACCOMMODATE THE
HOSE COMING FROM
THE OPPOSITE
DIRECTION
**B

Advertisement

Table of Contents
loading

Table of Contents