Site Selection and Preparation
Install the generator set, in its protective enclosure,
outdoors where adequate cooling and ventilating air is
always available
(Figure
The installation of the generator must comply
strictly with ICC IFGC, NFPA 37, NFPA 54, NFPA
58, and NFPA 70 standards.
Install the unit where air inlet and outlet openings
will not become obstructed by leaves, grass, snow,
etc. If prevailing winds will cause blowing or
drifting, consider using a windbreak to protect the
unit.
Install the generator on high ground where water
levels will not rise and endanger it. This unit should
not operate in or be subjected to standing water.
Allow sufficient room on all sides of the generator
for maintenance and servicing. This unit must be
installed in accordance with any local, state, or
national codes for minimum distances from other
structures.
Clearance from the ends and front of the generator
must be 3 ft (0.91 m). This includes shrubs,
bushes, and trees. Clearance from the back of the
generator must be a minimum of 18 in (457 mm).
Clearance at the top should be a minimum of 5 ft
(1.52 m) from any structure, overhang, or
projections from the wall.
DO NOT install under wooden decks or structures
unless there is at least 5 ft (1.52 m) of clearance
above the generator.
Install the unit where rain gutter down spouts, roof
run-off, landscape irrigation, water sprinklers, or
sump pump discharge does not flood the unit or
spray the enclosure, including any air inlet or outlet
openings.
Install the unit where services will not be affected
or obstructed, including concealed, underground,
or covered services such as electrical, fuel, phone,
air conditioning, or irrigation. This could affect
warranty coverage.
Where strong prevailing winds blow from one
direction, face the generator air inlet openings to
the prevailing winds.
Install the generator as close as possible to the fuel
supply to reduce the length of piping. REMEMBER
THAT LAWS OR CODES MAY REGULATE THE
DISTANCE AND LOCATION. In the absence of
local codes regarding placement or clearance, we
recommend following these guidelines:
– Install the generator as close as possible to the
connected loads. REMEMBER THAT LAWS OR
CODES MAY REGULATE THE DISTANCE AND
LOCATION.
12
3-1). Consider these factors:
– The generator must be installed on a level sur-
face. The generator must be level within a 0.5 in
(13 mm) all around.
– The generator is typically placed on pea gravel,
compacted soil, crushed stone, or a concrete
pad. Check local codes to see what type is
required. If a concrete pad is required, all appli-
cable codes should be followed.
Installation Guidelines for Stationary Air-Cooled
Generators
NFPA
37
is
the
The
Association's standard for the installation and use of
stationary combustion engines. Its requirements limit the
spacing of an enclosed generator set from a structure or
wall
(Figure
3-1).
NFPA 37, Section 4.1.4, Engines Located Outdoors:
Engines, and their weatherproof housings if provided,
that are installed outdoors shall be located at least 5 ft
(1.52 m) from openings in walls and at least 5 ft (1.52 m)
from structures having combustible walls. A minimum
separation shall not be required where the following
conditions exist:
1. The adjacent wall of the structure has a fire
resistance rating of at least one hour.
2. The weatherproof enclosure is constructed of
noncombustible
materials
demonstrated that a fire within the enclosure will
not ignite combustible materials outside the
enclosure.
Annex A — Explanatory Material
A4.1.4 (2) Means of demonstrating compliance are by
means of full scale fire test or by calculation procedures.
Because of the limited spaces that are frequently
available for installation, it has become apparent that
exception (2) would be beneficial for many residential
and commercial installations. With that in mind, the
manufacturer contracted with an independent testing
laboratory to run full scale fire tests to assure that the
enclosure will not ignite combustible materials outside
the enclosure.
NOTE: Southwest Research Institute testing approves
18 in (457 mm) installation minimum from structure
(Figure
3-1, C). Southwest Research Institute is a
nationally recognized third party testing and listing
agency.
The criteria was to determine the worst case fire scenario
within the generator and to determine the ignitability of
items outside the engine enclosure at various distances.
The enclosure is constructed of non-combustible
materials, and the results and conclusions from the
independent testing lab indicated that any fire within the
Installation Guidelines For 60 Hz EcoGen™ Generators
National
Fire
Protection
and
it
has
been

Advertisement

Table of Contents
loading

Table of Contents