Rack Precautions

Ensure that the leveling jacks on the bottom of the rack are fully extended to
the floor with the full weight of the rack resting on them.
In single rack installations, stabilizers should be attached to the rack.
In multiple rack installations, the racks should be coupled together.
Always make sure that the rack is stable before extending a component from
the rack.
You should extend only one component at a time - extending two or more
simultaneously may cause the rack to become unstable.
When initially installing the server to a rack, test that the rail locking tabs en-
gage to prevent the server from being overextended. Have a rack lift in place
as a precaution in case the test fails.
In any instance of pulling the system from the rack, always use a rack lift and
follow all associated safety precautions.

General Server Precautions

Review the electrical and general safety precautions that came with the com-
ponents you are adding to your chassis.
Determine the placement of each component in the rack before you install the
rails.
Install the heaviest server components on the bottom of the rack first, and
then work upwards.
Use a regulating uninterruptible power supply (UPS) to protect the server from
power surges, voltage spikes and to keep your system operating in case of a
power failure.
Allow the hot plug hard drives and power supply modules to cool before
touching them.
Always keep the rack's front door and all panels and components on the serv-
ers closed when not servicing to maintain proper cooling.