Chapter 6 Rack Installation; Unpacking The System; Preparing For Setup; Choosing A Setup Location - Supero SC847 Series User Manual

Double-sided storage
Table of Contents

Advertisement

This chapter provides instructions for installing the chassis into a rack. .
6-1

Unpacking the System

You should inspect the box the chassis was shipped in, and note if it was damaged
in any way. If the chassis itself shows damage, you should file a damage claim with
the carrier who delivered it.
There are alternate design mounting rails available for the SC847 chassis. Be sure
you have ordered and received the type you want.
6-2

Preparing for Setup

Decide on a suitable location for the rack unit that will hold your chassis. It should
be situated in a clean, dust-free area that is well ventilated. Avoid areas where
heat, electrical noise and electromagnetic fields are generated. Place it near a
grounded power outlet. .

Choosing a Setup Location

Leave enough clearance in front of the rack to enable you to open the front
door completely (~25 inches).
Leave approximately 30 inches of clearance in the back of the rack to allow
for sufficient airflow and ease in servicing.
This product is for installation only in a Restricted Access Location (dedicated
equipment rooms, service closets and similar environments).
Chapter 6
Rack Installation
6-1
Chapter 6: Rack Installation

Advertisement

Table of Contents
loading

Table of Contents