Warnings And Precautions; Rack Precautions; General Server Precautions - Supero SC847J Series User Manual

Table of Contents

Advertisement

SC847J Chassis Manual
!
5-4

Warnings and Precautions

Rack Precautions

Ensure that the leveling jacks on the bottom of the rack are fully extended to
the floor with the full weight of the rack resting on them.
In single rack installations, stabilizers should be attached to the rack.
In multiple rack installations, the racks should be coupled together.
Always make sure that the rack is stable before extending a component from
the rack.
You should extend only one component at a time - extending two or more si-
multaneously may cause the rack to become unstable.

General Server Precautions

Review the electrical and general safety precautions that came with the com-
ponents you are adding to your chassis.
Determine the placement of each component in the rack
rails.
Install the heaviest server components on the bottom of the rack first, and then
work upwards.
Use a regulating uninterruptible power supply (UPS) to protect the server from
power surges, voltage spikes and to keep your system operating in case of a
power failure.
Allow the hot plug hard drives and power supply modules to cool before touch-
ing them.
Warning!
5-2
!
before you install the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sc847e16-rjbod1Sc847e26-rjbod1

Table of Contents