Attaching Fascia Assembly - Rinnai RIBF25N Operation & Installation Manual

Gas log flame fire
Table of Contents

Advertisement

COMPLETING HEATER INSTALLATION

ATTACHING FASCIA ASSEMBLY

Step 7. Attach the Fascia to the Heater Engine
Locate and remove the two 8g x 10mm fascia assembly
securing screws
pre-positioned in the fascia mounting tabs
A
on the gas/electrical access plate
B
These screws have been pre-inserted by the
manufacturer to ensure correct threading of the
NOTE
fascia securing tabs.
Carefully pick up fascia assembly taking care not to tilt it on it's
edge as the glass may slide out of the stand off posts.
Position the top fold
tabs
and gently push the lower edge of the fascia assembly
E
until it is flush at the edges.
Fit and tighten the two fascia retaining screws
the fascia
and the fascia mounting tabs
F
engine body.
The glass dress guard fitted to this appliance
reduces the risk of fire and injury and no part of it
NOTE
should be permanently removed.
For protection of young children or the infirm a
secondary guard is required.
If the heater is not operating correctly refer to the
"TROUBLE SHOOTING CHECKLIST" on page 8
IMPORTANT
before contacting Rinnai.
It is the responsibility of the installer to check that
under normal operating conditions of the
appliance, all flue gases are exhausted to the
outside atmosphere and that there is no spillage
of combustion gases into the room. Please refer
to AS/NZS 5601.
During
the
approximately 2 hours, some smoke and odour
may be experienced. During this period the heater
should be operated on High and the space being
heated should be well ventilated. It may take up to
20 minutes of operation for the logs to achieve
their full flame pattern and glow.
Burner aerations are factory set and can not be
adjusted. If you are unable to get the unit to
operate correctly refer to "TROUBLE SHOOTING
CHECKLIST" on page 8 before contacting Rinnai.
Step 8. Complete installation checklist
Complete the installation checklist on page 29 and the installer details on page 2, make sure that this instruction
book is left with the customer.
Rinnai Australia
.
C
over the fascia assembly mounting
D
B
initial
burning
in
B
through both
A
on the heater
period
of
26
A
C
Rear view of installed
fascia for reference
E
F
B
Slimfire 252 Operation & Installation Manual
D
E

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slimfire 252Ribf25l

Table of Contents