Maintenance; Periodic Examination Of Venting And Boiler; Inspection - Rinnai E110CN Installation & Servicing Instructions Manual

High efficiency condensing gas boiler
Table of Contents

Advertisement

13

Maintenance

i
NOTICE
13.1 Periodic examination of venting systems and boiler
i
NOTICE

13.2 Inspection

Removing casing
figure29
Removing casing
figure 30
Maintenance or changes to the boiler may only be carried out by a qualified
technician.
The inspection of the boiler and venting system should be done every 2 years and
full maintenance every 4 years or 4000 hours of operation, whichever occurs first..
When doing this the circumstances of the boiler's location must be taken into account.
From this one can determine whether to deviate from this advice.
Please contact Rinnai for further guidance on the frequency and service
requirements. Contact details can be found on the back page of this manual.
Preparing the boiler for inspection
To carry out the maintenance activities please follow the next procedure:
-
switch off the power supply;
-
shut off the gas;
-
valve off the boiler from the system using the boiler isolation valves in the plumbing
kit.
remove the 4 screws A,B,C and D in the quick releases of the casing (figure 29);
-
-
remove the screw E behind the door on the front of the casing (figure 30);
-
remove it towards the front.
-
clean the casing with a cloth with a simple (non-abrasive) cleaning agent;