Packaging And Transportation; Scope Of Delivery; Transportation - Rinnai E110CN Installation & Servicing Instructions Manual

High efficiency condensing gas boiler
Table of Contents

Advertisement

4

Packaging and transportation

4.1 Scope of delivery

4.2 Transportation

!
CAUTION
The boiler is supplied ready for use.
Please check if the packaging is intact.
Check if all the items listed are included in the delivery.
The supply kit is contents:
Boiler with casing;
Automatic air separator (inside the boiler);
Wall mounting suspension bracket;
Bronze adapter fittings;
3" PP exhaust adapters (x2);
Plumbing kit
Fixing material consisting of plugs and screws;
The boiler may be damaged when not secured properly.
-
Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
-
When shipping the boiler must be secured on the transportation equipment to
prevent it from falling off.
-
Protect all parts against impacts if they are to be transported.
-
Follow the transportation markings on the packaging.
Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
Template;
Installation instructions;
User manual;
Service manual;
Outdoor sensor ARV12
3/4" gas shut off valve
9

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

E75cnE75cpE110cp

Table of Contents