Maintenance; Owner Maintenance; Licensed Professional Maintenance; Test The Ignition Safety Shut Off Device - Rinnai i060C Installation And Operation Manual

Wall-mounted, gas-fired combi boiler
Hide thumbs Also See for i060C:
Table of Contents

Advertisement

13
Topics in this section

Owner Maintenance

Licensed Professional Maintenance

Test the Ignition Safety Shut Off
Device
WARNING
Maintenance is required to
maintain safe operation of the
boiler.
The boiler must be inspected
annually by a licensed professional.
Repairs and maintenance shall be
performed by a licensed
professional. The licensed
professional must verify proper
operation after servicing.
Keep the boiler area clear and free
from combustible materials,
gasoline, and other flammable
vapors and liquids.
To protect yourself from harm,
before performing maintenance:
Turn off the electrical power
supply by unplugging the
power cord or by turning off
the electricity at the circuit
breaker. (The boiler controller
does not control the electrical
power.)
Turn off the gas at the manual
gas control valve, usually
located immediately below
the boiler.
Turn off the incoming water
supply. This can be done at
the isolation valve
immediately below the boiler
or by turning off the water
supply to the building.
106
WARNING
If you encounter a problem that is
difficult to solve, stop the operation
and immediately contact a licensed
professional.
MONTHLY
Boiler Area
Verify the area is free of combustible
materials, gasoline and other
flammable vapors and liquids.
Verify the area is clean from dust and
obstructions
Verify the air intake area is free of any
contaminants listed in the boiler
Installation and Operation Manual.
Any contaminants in the boiler intake
air vicinity must be removed. If they
cannot be removed, contact a licensed
professional.
Piping
Inspect all water, gas, and
condensation piping for leaks. Look
for signs of leaking lines or corrosion.
Confirm the condensation line is not
blocked. If a condensation drain pump
is used, confirm the condensation
drain pump operates correctly.
Venting
Verify the boiler vent discharge and
air intake is clean and free of
obstructions.
Check for leakage, damage, or
deformation of venting.
Boiler
Verify the boiler is free from any
abnormal situations, such as
diagnostic error codes, loud noises,
leakage or other potential issues.
Check that the pressure on the
controller display or external pressure
gauge indicates 17 to 26 psi (117 to
180 kPa).
Rinnai I-Series Condensing Boiler Combi Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents