Concluding Work; Closing All Covers; Ground Wire Test - Siemens ARCADIS Varic Replacement Instructions Manual

Hide thumbs Also See for ARCADIS Varic:
Table of Contents

Advertisement

3 - 8

Concluding work

Closing all covers

Close all covers again. Make sure that the protective ground wire connections make good
contact.

Ground wire test

Perform the ground wire test according to ARTD-002.731.17....
Also observe the information on the ground wire test in chapter 1 of these instructions.
Document the measuring procedure.
The measured values must be documented and evaluated in the ground wire resistance
protocol.
NOTE
The ground wire resistance must not exceed 0.2 ohms.
ARCADIS
System Manual
Installing the ON/OFF assembly
Evaluate the results by comparing the first measured value to the
corresponding values documented during preceding
maintenance procedures or safety checks.
A sudden or unexpected increase of the measured values,
even if the limit value of 0.2 ohms is not exceeded,
indicates errors in the ground wire connections.
(Ground wire or contacts)
n.a.
SP00-000.841.01
Rev. 01
Page 8 of 10
08.05
CS PS 24
3
3
3
Siemens AG
Medical Solutions

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arcadis orbic

Table of Contents