C H A P T E R 3
I
NSTALLATION
This section explains:
Equipment inspection
S
UPS installation
S
UPS rear panels
S
Inspecting the Equipment
If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase and
file a claim for shipping damage. If you discover damage after
acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with
the carrier within 15 days of receipt of the equipment; 2) Send a copy of
the damage claim within 15 days to your service representative.
Installing the UPS
The following steps explain how to install the UPS. Figure 2 shows a
typical installation only. See "UPS Rear Panels" on page 20 for the rear
panel of each model.
NOTE Do not make unauthorized changes to the UPS; otherwise, damage may occur
to your equipment and void your warranty.
1. If installing an optional EBM, continue to Step 2; otherwise,
2. Plug the EBM cable into the battery connector on the UPS rear
3. If a second EBM is to be installed, plug the EBM cable of the
Powerware
5125 Tower (1000–2200 VA) User's Guide
®
skip to Step 4.
panel (see Figure 2).
second cabinet into the battery connector on the first EBM. Up
to four EBMs may be connected to the UPS.
Rev B www.powerware.com
S
17