Master FFLS325 Operation Manual page 31

Laser screed

Advertisement

Solution:Suggest to use the concrete vibrator, then use the machine
to leveling.
4.The ground plane less than expected value after leveling.
Reason:With different slump concrete, the after vibrating
concrete slump is different.
Solution:Adjust leveling elevation according to the worker's
experience.
4. Not working of the electrical components
Reason:The cable falls off or wrong cable connection.
Solution:Reconnect the cable.
6. Generators cannot start
Reason: The temperature is too high or the temperature of the
Solution:Adjust the degree of the throttle.
Tel:(+86)17737606271
generator body is too high, degree of throttle is too
small; The temperature is too low, and the degree of
throttle is too big.