Download Print this page

Master FFLS325 Operation Manual page 14

Laser screed

Advertisement

Switches on the control panel(Pic 4.6)
No.
Item
1
Power switch
2
Emergency switch
3
Switch of LED
4
Forward/back
5
Adjust speed
6
Up/down(Lift arm)
7
Manual/automatic
8
Manual/automatic(blade)
9
Up/down right(blade)
10
Up/down left(blade)
11
Vibration switch
12
Turn left
13
Turn right
V. Operation
5.1 Start the machine
1. Preparations before starting
1.
Connect the vibrating leveling part and the power part correctly
2.
Check if the joints are tightened, especially the screws on vibration part
Check if the fuel in generator is adequacy (see P7 for generators detecting before
3.
operation)
4.
Check the switches are working normally and make them at "0" or "Manual"
Tel:(+86)17737606271
Pic 4.6 control panel
Function
Master switch
Emergency stop
Control LED light
Control the machine forward or back
Adjust the walking speed
Adjust the machine level
Adjust the level of the machine manually or
automatically
adjustment of the height of the blade manually or
automatically
Control the left of the blade to be up or down
Control the left of the blade to be up or down
Control vibrating motor to work or stop
Turn left
Turn right
Pic 4.4 Introduction of switches
10
Henan Master Machinery Co., Ltd
www.mastermachinerys.com

Advertisement

loading