Download Print this page

Master FFLS325 Operation Manual page 26

Laser screed

Advertisement

7.2Transportation:
(1). Pave the ramp on the end of the truck, and keep them
fastness.
(2). Make sure all the switch are shut down
(3). Assemble the wheels in the rear side of the machine.
(4). Start the machine。
(5). Driving the machine on the ramp ,As below pictures 7.2,
please pay attention to the safety when moving。 (Should
pull the machine with the
machine from accidental fast falling. Not stay at the ramp
for long time!)
Tel:(+86)17737606271
7.1 Machine wheel
mooring rope. To prevent the
22
Henan Master Machinery Co., Ltd
www.mastermachinerys.com

Advertisement

loading