5. Feed On/Off switch
through drawer frame
Figure 24.e On/Off switch through drawer
7. Disconnect On/Off switch and feed cable through drawer
frame. Install in space on board drawer.
Figure 24.g On/Off switch
8. Place Fan wire on leftside firebox floor with adhesive wire
pad. For fan Install instructions see Optional fan kit Install/
Replace instructions
Figure 24.h Fan wire
34
6. Feed Fan, LED, PPO,
and pilot wires through
drawer frame.
Figure 24.f Fan, LED, PPO, and pilot wires
through drawer
9. Place on LED wire on rightside firebox floor with adhesive
wire pad. For LED Install instructions see Optional LED kit
Install/Replace instructions
Figure 24.i LED wire
10. Loop Pilot wires from behind control board drawer to the
front. Plug into X2 and X3
Figure 24.j Pilot wires
11. Valve wires are plugged into the valve in the Green, Red, and
yellow ports respectively.
Figure 24.k Valve wires
Installation
XG0222