Checklist D Pr ocedur es
D-1
D-1 Check the Boom Wear Pads

Check the Boom Wear Pads

Genie specifications require that this procedure be
performed every 1000 hours or annually,
whichever comes first.
Maintaining the boom wear pads in good condition
is essential to safe machine operation. Wear pads
are placed on boom tube surfaces to provide a low
friction, replaceable wear pad between moving
parts. Improperly shimmed wear pads or continued
use of extremely worn wear pads may result in
component damage and unsafe operating
conditions.
1
Start the engine from the ground controls.
2
Raise the end of the primary boom to a
comfortable working height (chest high), then
extend the boom 1 foot / 30 cm.
3
Measure each wear pad. Replace the wear
pad once it reaches the minimum allowable
thickness. If the wear pad is still within
specification, shim as necessary to obtain
minimum clearance with zero binding.
S-60 • S-65 • S-60 TRAX • S-65 TRAX • S-60 HC • S-60X • S-60XC
Part No. 825591

Checklist D Procedures

4
Extend and retract the boom through the
entire range of motion to check for tight spots
that may cause binding or scraping of the
boom.
Note: Always maintain squareness between the
outer and inner boom tubes.
Wear pad specifications
Top and side wear pads
(platform end of boom)
Bottom wear pads
(platform end of boom)
Top and side wear pads
(pivot end of boom)
Bottom wear pads
(pivot end of boom)
Service Manual
Minimum
1/2 inch
12.7 mm
5/8 inch
15.9 mm
1/2 inch
12.7 mm
5/8 inch
15.9 mm