Terminal Box; Paint Finish - Siemens SIMOTICS DP Operating Instructions Manual

Low-voltage motors
Table of Contents

Advertisement

• Measuring nipple for SPM shock pulse measurement for bearing monitoring
• Backstop
Note
Further documents
Observe all of the other documents provided with this machine.
Supplementary devices
Depending on the order, various supplementary devices can be installed or mounted. These
include sensors for bearing temperature monitoring or winding monitoring, for example.
3.3.10

Terminal box

As an option, additional connecting terminals are available in the terminal box for monitoring
equipment. For larger machines, an additional terminal box can be optionally mounted. You can
see the number of available terminals in the circuit diagrams.
3.3.11

Paint finish

Paint finish
The machine is painted according to the instructions in your order.
1FZ shaft height 280
Operating Instructions, 02/2022, A5E51698698A
Description
3.3 Installation
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simotics gpSimotics sd

Table of Contents