Unit Assembly Prior To Installation; Top Standoff Assembly; Nailing Strips - Regency Bellavista B36XTCE Owners & Installation Manual

Hide thumbs Also See for Bellavista B36XTCE:
Table of Contents

Advertisement

installation

UNIT ASSEMBLY PRIOR TO INSTALLATION

The Top Nailing Support, the Side Nailing Strips, the 2 Top Standoffs and the Flue Collar must be correctly positioned and attached before the fireplace is
moved into position.

TOP STANDOFF ASSEMBLY

The top standoffs are shipped in a flat position and must be folded into shape and
attached.
Take each standoff and bend into the correct shape. Bend up at the bend lines until
the tab in the standoff and the pre-punched slots on the fireplace top line up. Be sure
to use correct slots, they are marked.

NAILING STRIPS

1. There are 8 (eight) side nailing strips and one top nailing strip available on the unit. One set of four (4) are for a clean finish installation, the other set are
for a tile finish installation as they are set back 1/2" (13mm). The top nailing strip is adjustable to 1/2" (13mm).
2.
Bend the required four (4) nailing strips to 90º.
3. Attach top nailing strip with one (1) screw (located at the back of the nailing strip). Adjust to required position, flush or back 1/2" and tighten screw.
|
24
Bellavista® B36XTCE-11 Gas Fireplace
Adjustable Top
Nailing Strip
Nailing strip for
Clean Finish (set
flush with unit)
Nailing strip for
Tile Finish (set
back 1/2")
STANDOFF SLOT LOCATION
TopView
B36XT/
B36XTE/
B36X
B36X
B36XTCE
B36XT/
B36XTE/
B36XTCE
Nailing strip for
Tile Finish (set
back 1/2")
Nailing strip for
Clean Finish (set
flush with unit)

Advertisement

Table of Contents
loading

This manual is also suitable for:

B36xtce-11Bellavista b36xtce-11

Table of Contents