24. Installation/Re-installation of the required screen barrier assembly
1. The screen barrier assembly has four receiving slots that will hook over the four tabs on the fireplace then slide down in place (Figure 42).
Figure 42 - Barrier Installation - Barrier Hook View
f i r e - p a r t s . c o m
Barrier in Place

Install the Finishing Materials

25.
1. Complete finished interior wall.
NOTE: To install the fireplace facing flush with the finished
wall, position framework to accommodate the thickness of the
finished wall.
NOTE: See Cold Climate Insulation on Page 11 and Vent
Termination Clearances on Page 13.
Attach the Safety-in-Operation Warning Labels
26.
1. Attach the furnished safety instruction labels at all fireplace
operation and control points (Page 51).
NOTE: The installer MUST ensure these warnings are properly
attached during installation. The warning labels are a critical
means of informing consumers of safe operation practices.
50
Barrier Hook
Figure 43 - Combustible Wall Framing
Combustible Finished
Wall Materials
Stand Off Must Be Bent
To Vertical Position
Standoff Provides Space
From Combustible Materials
Hood
Installation
900994-00K, 07/2021
Tab with
Slots
This Area Must
Remain Clear
of Combustible
3"
Materials
(77 mm)
1" Min.
(26 mm)
Top Of Appliance
4" Clearance Minimum