National Instruments FieldPoint cFP-21 Series Quick Start Manual page 15

Hide thumbs Also See for FieldPoint cFP-21 Series:
Table of Contents

Advertisement

324033b.fm Page 15 Wednesday, September 14, 2005 2:09 PM
7. Power Up the cFP-21xx
Check the DIP switches on the controller, making sure that the RESET IP switch
is in the OFF position. Plug in each power supply to the Compact FieldPoint
system. The cFP-21xx runs a power-on self test (POST) that takes several seconds.
You should see the POWER and STATUS LEDs come on. After about three
seconds, the STATUS LED begins flashing steadily. The cFP-21xx is ready to be
configured.
If you have already assigned an IP address to the cFP-21xx, the STATUS LED
turns off. The total boot time for a configured system is 10–15 seconds.
If the STATUS LED does not light up as described here, refer to the cFP-21xx and
cFP-BP-x User Manual at
your CD-ROM drive.
© National Instruments Corporation
d :\docs\Network Modules
DIP Switches
Functions
1, 2 .........................Disabled
3, 4 .........................User-configurable
5 .............................CONSOLE OUT
6 .............................DISABLE VI
7 .............................SAFE MODE
8 .............................RESET IP
15
, where
is the letter of
d
cFP-21xx Quick Start Guide

Advertisement

Table of Contents
loading

Table of Contents