National Instruments FieldPoint cFP-21 Series Quick Start Manual page 12

Hide thumbs Also See for FieldPoint cFP-21 Series:
Table of Contents

Advertisement

324033b.fm Page 12 Wednesday, September 14, 2005 2:09 PM
4. Install Connector Blocks on the Backplane
In order to connect I/O modules to input signals or to external loads, you need to
install a cFP-CB-x connector block or other connectivity accessory for each I/O
module on the backplane. Use the connector socket to the right of each I/O module
socket.
Caution
Do not insert or remove connector blocks or other connectivity
accessories while power is applied to them.
1. Wire field devices as described
in the I/O module and connector
block operating instructions.
Caution
Hazardous voltage
wiring should be performed
by qualified personnel and
in accordance with local
electrical standards.
2. Align the captive screws on the
connector block with the holes
on the backplane.
3. Press firmly to seat the connector block on the backplane.
4. Using a number 2 Phillips screwdriver with a shank of at least 64 mm (2.5 in.)
length, tighten the captive screws to 1.1 N · m (10 lb · in.) of torque.
5. Repeat this procedure to install additional connector blocks on the backplane.
cFP-21xx Quick Start Guide
12
ni.com

Advertisement

Table of Contents
loading

Table of Contents