Index
Index
1. Information
2. Preparing for installation
3. Installation sequence
4. Commissioning, inspec-
tion, maintenance
5. Maintenance
4
Disposal of packaging ............................................................................
Symbols .................................................................................................
Intended use ..........................................................................................
Product information ................................................................................
Type BW 301.B and BWC 301.B ........................................................
■
Type BWS 301.B (heat pump stage 2) ...............................................
■
System examples ...............................................................................
■
Designations in the system examples ...................................................
Primary circuit, type BW/BWC 301.B ..................................................... 10
With water/water heat pump conversion kit: 1 primary pump ............. 10
■
Primary circuit, type BW 301.B + BWS 301.B (2-stage) ........................ 12
With water/water heat pump conversion kit: 2 primary pumps ........... 12
■
With water/water heat pump conversion kit: 1 common primary
■
pump ................................................................................................... 14
Requirements for on-site connections ................................................... 17
1-stage (type BW 301.B, BWC 301.B) ............................................... 17
■
2-stage (type BW 301.B + BWS 301.B) .............................................. 18
■
Siting and transport requirements .......................................................... 19
Transport ............................................................................................ 19
■
Installation room requirements ........................................................... 19
■
Positioning the heat pump ..................................................................... 21
Removing the top panel ......................................................................... 22
Making the hydraulic connections .......................................................... 22
Connecting the primary circuit ............................................................ 22
■
Connecting the secondary circuit ....................................................... 23
■
Electrical connection .............................................................................. 24
Preparing the electrical connections ................................................... 24
■
Installing the programming unit (type BW 301.B and BWC 301.B) .... 25
■
Routing cables to the wiring chamber ................................................ 26
■
Making the electrical connection of heat pump stage 1 (type
■
BW 301.B) and stage 2 (type BWS 301.B) ......................................... 27
Overview of the electrical connections of the heat pump control unit
■
(type BW/BWC 301.B) ........................................................................ 28
Main PCB (230 V~ components) ........................................................ 28
■
Expansion PCB on main PCB (230 V~ components) ......................... 32
■
Cross connect PCB (signal and safety connections) .......................... 36
■
Controller and sensor PCB (sensors) ................................................. 38
■
Connection of primary circuit flow/return temperature sensor, 2-
■
stage heat pump ................................................................................. 40
Swimming pool heating ...................................................................... 40
■
Power supply ......................................................................................... 41
Heat pump control unit power supply 230 V~ ..................................... 42
■
Compressor power supply 400 V~ ..................................................... 42
■
Power supply with power-OFF: Without on-site load disconnect ....... 43
■
Power supply with power-OFF: With on-site load disconnect ............ 44
■
Mains power supply in conjunction with on-site power consumption . 47
■
Smart Grid .......................................................................................... 47
■
Phase monitor (if installed) ................................................................. 49
■
Make connections at terminals X3.8/X3.9 ............................................. 50
Closing the heat pump ........................................................................... 50
Checking the diaphragm grommets ....................................................... 51
Steps - commissioning, inspection and maintenance ............................ 52
Overview of wiring chamber .................................................................. 67
Type BW/BWC 301.B ......................................................................... 67
■
Type BWS 301.B ................................................................................ 68
■
6
6
6
7
7
7
8
9