Viessmann Vitocal 300-G Installation And Service Instructions Manual page 116

Heat pump with electric drive, 1 and 2-stage. brine/water heat pump: 5.7 to 34.4 kw. with conversion kit to water/water heat pump: 7.5 to 45.2 kw
Table of Contents

Advertisement

Commissioning/service reports
Control parameters report
Electric booster heater
Parameter
"Enable instantaneous heating water
heater"
"Enable electric heaters for DHW heat-
ing"
"Enable instant. heating water heater for
central heating"
Start delay instantaneous heating water
heater
"Max. output instantaneous heating wa-
ter heater"
"Output for instant. heating water heater
at power-OFF"
"Dual mode temp instant. heating water
heater"
Internal hydraulics
Parameter
Heat pump for drying a building
Time program for screed drying
Set flow temperature external demand, cool-
ing
Set flow temperature external demand
"Enable 3-way diverter valve heating/
DHW"
Start threshold
Cycle rate heating circuit pumps
"Operating mode secondary pump"
Starting time high efficiency circulation
pump
Screed program start day
Screed program end day
"Operating mode secondary pump 2"
Primary source
Parameter
"Primary source mode"
"Primary source ctrl strategy"
Start performance primary source
Primary circuit pump type
Min. primary circuit inlet temperature in op-
eration
Response delay, probe protection
116
(cont.)
Code
Delivered condition Commission-
7900
0
7901
0
7902
1
7905
30 min
7907
3
790 A
0
790 B
500 (
Code
Delivered condition Commission-
7300
0
7303
0
730A
Do not adjust.
730C
500 (
730D
0
730E
300 (
7319
0
7340
Type BW 301.B: 0
Type BWC 301.B: 3
7365
5 s
7378
1
7379
31
73C0
0
Code
Delivered condition Commission-
7400
0
7401
Type BW: 0
Type BWC: 3
7414
50 %
745A
Do not adjust.
7470
Do not adjust.
7471
Do not adjust.
ing
50 °C)
ing
50 °C)
30 K
min)
·
ing
Maintenance/
Service
Maintenance/
Service
Maintenance/
Service

Advertisement

Table of Contents
loading

Table of Contents