Commissioning the system
Required heat pump parameters
"Output compressor stage 5030"
During commissioning, the heating output of the heat
pump must be set subject to type.
Type AWT/AWT-AC
"Output compressor stage 5030"
Required parameters for components connected on site
Parameters may need to be set subject to the type of
appliance, the selected system scheme and the acces-
sories used.
Overview of required parameters: See following chap-
ters.
System scheme
Overview of all available system schemes
Component
Heating circuit
A1/HC1
M2/HC2
DHW cylinder
Heating water buffer cylinder
Instantaneous heating water heater
Swimming pool
Solar thermal system
(with integral solar control function)
Cooling
A1/HC1
M2/HC2
Separate cooling circuit
SKK
Electricity meter, 3-phase
Ventilation unit
X Component is selected.
Component may be added.
0
(cont.)
241.A04 241.A05 241.A07 241.A10
4 kW
System scheme
0
1
X
—
—
—
X
—
—
0
X
X
—
0
—
0
—
0
—
—
0
0
0
0
0
0
Commissioning, inspection, maintenance
5 kW
7 kW
Detailed explanations on parameters
"Vitotronic 200" heat pump control unit service
instructions
2
3
4
X
—
—
X
X
—
X
X
—
X
X
0
X
X
X
0
0
0
—
0
0
—
—
0
—
0
0
0
0
0
0
0
0
0
0
0
"System examples, heat pumps"
241.A13
241.B10
241.B13
10 kW
13 kW
5
6
X
X
X
X
X
—
X
X
X
X
0
0
—
0
0
0
0
0
0
0
0
0
0
0
241.B16
16 kW
11
—
—
—
—
—
—
—
—
—
—
0
0
59