Download Print this page

Ioline CrystalPress Quick Start Manual page 6

Sorter bowl replacement
Hide thumbs Also See for CrystalPress:

Advertisement

The nuts are correctly tightened
9
when the bowl slides in and out
with light resistance without allow-
ing the bowl to be lifted up. Test
this when the machine is rotated
back to normal operating position in
the next step. Check tightness care-
fully before further assembly.
Flip the machine back to its normal
10
operating position and reconnect
the power cable.
Install wheels in the new bowl and
power on the CrystalPress to make
sure the new bowl rotates as it
should. If it doesn't rotate after
power on there is a problem with
the connection to the logic board.
Check connections and test again.
Contact Ioline Customer Support for
additional help.
If the bowls rotate normally during power on then power off the machine and disconnect the
11
power cable to install the bottom cover by reversing steps 1-3 in the earlier section Preparing to
Disassemble. Consult the Bowl Alignment Procedure to align the bowls with the C-stick and com-
plete the installation.
Customer Support
Ioline Corporation is committed to providing quality service and support to our customers. If you
need assistance with an Ioline product, please contact us:
Ioline Customer Support Department
Monday through Friday
7:00 A.M. - 5:00 P.M. U.S. Pacific Time
Voice: 1.425.398.8282
Fax: 1.425.398.8383
support@ioline.com
The bowl should slide up and down
smoothly before returning the machine
to normal operating position.
www.ioline.com
6
14140 NE 200th St.
Woodinville, WA 98072 USA
1.425.398.8282
www.ioline.com
There should be no play
at all when lifting up
on the bowl (when the
machine is rotated back
to a normal operating
position)

Advertisement

loading