Shindaiwa DG25MK Assembly And Instruction Manual page 30

Diesel engine generator
Hide thumbs Also See for DG25MK:
Table of Contents

Advertisement

Stop Mode
Button
Voltage
Regulator
Power Switch
(1) Manual Start
Set frequency. (Refer to section"5-4. Frequency change" )
1
Turn the Circuit Breaker to OFF position.
2
Turn the Power Switch to ON position.
3
< Note >
 When turn the Power Switch to the ON position, the "Low Oil Pressure" and "High Coolant
Temperature" warning indicators will illuminate, but all indicator lights will turn off when the
engine is started.
Press the Manual Mode Button.
4
Press the Start Button to start the engine.
5
< Note >
 When the Start Button is pressed, preheating is automatically performed, but preheating is
skipped when the coolant temperature not less than 30 degrees.
 Pre-heating time depends on the coolant temperature.
 Automatically repeats "Crank Attempt" and "Crank Rest" up to 3 times.
 Please keep in mind that the muffler may emit some smoke when engine is started.
Let engine idles for approximately for five minutes.
6
Adjust the voltage regulator dial to the specified voltage.
7
50Hz Operation
60Hz Operation
* The values in brackets are for when set to 200/220V.
Turn on the Circuit Breaker to activate power supply.
8
(2) Auto Start
This generator has an Auto Start function that automatically start the engine by closing the
RS1/RS2 terminals. The engine stops automatically when the RS1/RS2 terminals open.
Before operating Auto Start, connect the RS1/RS2 terminals to the equipment.
< Note >
 When the RS1/RS2 terminals to close and press the Auto Mode Button, the engine will start up
immediately.
400V [200V]
440V [220V]
RS1 terminal
RS2 terminal
27
Manual Mode
Button
Circuit Breaker
Start Button
Auto Mode
Button