Operating Tests; Setup And Blowdown Inspection - Cleveland SteamCraft 21CET8 Operation Installation Maintenance Manual

Electric convection steamers
Hide thumbs Also See for SteamCraft 21CET8:
Table of Contents

Advertisement

CHAPTER 8

OPERATING TESTS

The Operating Tests prepare newly installed, serviced or repaired SteamCraft 21CET8's and 21CET16's
for operation. This section is divided into three sections: Setup and Blowdown Inspection, Keypad Timer
Control Tests, and Dial Timer Control Tests. Read and understand the sections before beginning.
Note: A watch with a second hand (or similar) is required for timing the functions.
Note: Times given in the test procedures are approximate and may vary slightly.
Note: 21CET8's and 21CET16's have EITHER a Float Switch OR a Water Probe. Any differences in
tests or functions are noted in the Operating Tests.
DEATH, INJURY, or EQUIPMENT DAMAGE can result from touching any component inside this appliance
when the power is connected to this appliance.
Whenever possible disconnect the power while installing, servicing, or testing this appliance.
When installation, service, or tests require power to be connected; use extreme caution and every
possible precaution and safety measure while testing or servicing this appliance.
A. SETUP and BLOWDOWN INSPECTION for ALL SteamCrafts
Complete the Setup and Blowdown Inspection BEFORE performing the Operating Tests
1.
Turn OFF the Main External Power Switch.
Verify installation of the proper size fuses or breakers.
2.
Open the water supply valves.
3.
Open the SteamCraft cooking compartment door. Check:
Proper installation of the Drain Screen.
Make sure the Drain Screen and Drain are not blocked.
Proper installation of the Slide Racks (pan racks).
Proper installation of the Door Gasket Assembly.
4.
Close the SteamCraft cooking compartment door.
5.
For Timer Control Panels, set either Control Panel as follows:
Turn OFF the ON/OFF Switch.
Set the TIMED/MANUAL Switch to TIMED. (Timer setting is unimportant at this step.)
NOTE: In step 7, when the Main External Power Switch is turned ON, the Keypad Timer is
blank without power or the Dial Timer's circuits are not powered even if the Timer is not
zeroed (pointing to the 0 mark).
Remove the control side access cover.
6.
7.
Turn ON the Main External Power Switch.
A 3-minute Blowdown Cycle starts immediately.
The condenser and drain valves are fully open.
EITHER The steam generator and float switch assembly are flushed with fresh water.
OR The steam generator IS flushed and water probe assembly is NOT flushed.
If water enters the water probe assembly cylinder: STOP, shut down, and call your
qualified Cleveland Range authorized Service Representative.
DANGER
ELECTRIC SHOCK HAZARD
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Steamcraft 21cet16

Table of Contents