Instructions For Installing The Sfu Ont; Figure 10. Typical Ont Installation - ADTRAN Total Access 300 Installation And Maintenance Practice

2 pots, 2 gige ont
Hide thumbs Also See for Total Access 300:
Table of Contents

Advertisement

2 POTS, 2 GigE ONT Installation and Maintenance Practice

Instructions for Installing the SFU ONT

A typical ONT installation with UPS is shown in
Customer provided premises
wiring including CAT5 or
higher Ethernet cable and
POTS twisted pair to be
terminated in the ONT by
technician
Riser conduit for
fiber drop cable
6 AWG ground wire
installed from the ONT
to the established MGN
Installations may vary from this diagram depending on the manner in which the Customer
Premises Equipment (CPE) wiring is installed, the location of the AC outlet used to power the
ONT local power supply, whether or not a communications distribution panel was provided,
and the proximity of the external ends of the CPE wiring to the subscriber's electrical service
point.
20

Figure 10. Typical ONT Installation

Figure
10.
Communications
Distribution
Panel
PVC conduit supplied by subscriber
with pull string for UPS low voltage
wiring installed by technician
UPS with battery backup
installed by technician
GFI/non-GFI outlet - highly
recommend non-GFI outlet
61187602G2-5A

Advertisement

Table of Contents
loading

Table of Contents