Paradyne 9120 User Manual page 35

Table of Contents

Advertisement

9121-A2-GB20-00
Test Status Messages:
These test messages appear in the right-most column of the System and Test
Status screen.
Message
What It Indicates
No Test Active
No tests are currently
running.
DSX-1 LLB Test Active A DSX-1 Line Loopback
(LLB) test is active.
DSX-1 PLB Test
A DSX-1 Payload
Active
Loopback (PLB) test is
active.
DSX-1 RLB Test
A DSX-1 Repeater
Active
Loopback (RLB) test is
active.
DTE External LB,
An external DTE Loopback
Port- n
is running on the selected
port ( Port-1 or Port-2 ).
DTE Initiated Ext. LB
DTE has initiated an
Port- n
external DTE Loopback on
the selected port ( Port-1 or
Port-2 ).
FCC Test Active
Should never see this
message.
June 1997
Displaying System Information
What To Do
No action needed.
Allow the loopback to continue
or abort the test.
Press Return ( ) while the
loopback is selected (via the
Command column) on the
DSX-1 Physical Tests screen
( Path: main/test/dsx _ phy) to
activate or deactivate the test.
Allow the loopback to continue
or abort the test.
Press Return ( ) while the
loopback is selected (via the
Command column) on the
DSX-1 Physical Tests screen
( Path: main/test/dsx _ phy) to
activate or deactivate the test.
Allow the loopback to continue
or abort the test.
Press Return ( ) while the
loopback is selected (via the
Command column) on the
DSX-1 Physical Tests screen
( Path: main/test/dsx _ phy) to
activate or deactivate the test.
Allow the loopback to continue
or abort the test.
Press Return ( ) while the
loopback is selected (via the
Command column) on the
port's Physical Tests screen
( Path: main/test/port- n _ phy)
to activate or deactivate the
test.
No action needed; allow the
test to continue.
Check the DTE.
Call your service representative
for assistance.
4-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

9121

Table of Contents