Daikin VRV IV Q+ Series Installer And User Reference Manual page 87

Hide thumbs Also See for VRV IV Q+ Series:
Table of Contents

Advertisement

To close the stop valve
To handle the stop valve cover
To handle the service port
Tightening torques
RXYQQ8~20U7Y1B
VRV IV Q+ series heat pump
4P546229-1A – 2020.10
1 Remove the stop valve cover.
2 Insert a hexagon wrench into the stop valve and turn the stop valve clockwise.
3 When the stop valve cannot be turned any further, stop turning.
4 Install the stop valve cover.
Result: The valve is now closed.
The stop valve cover is sealed where indicated by the arrow. Do NOT damage it.
After handling the stop valve, tighten the stop valve cover securely, and check for
refrigerant leaks. For the tightening torque, refer to the table below.
Always use a charge hose equipped with a valve depressor pin, since the service
port is a Schrader type valve.
After handling the service port, make sure to tighten the service port cover
securely. For the tightening torque, refer to the table below.
Check for refrigerant leaks after tightening the service port cover.
Stop valve size
(mm)
Ø9.5
Ø12.7
Ø15.9
Ø19.1
Ø25.4
Tightening torque (N•m) (when opening or closing)
Valve body
Hexagonal wrench
5~7
8~10
14~16
19~21
18
Piping installation
|
Service port
4 mm
10.7~14.7
6 mm
8 mm
Installer and user reference guide
87

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents