Sym ALA125CC Manual page 169

Table of Contents

Advertisement

SYM
INSTALLATION OF CLUTCH/DRIVEN
PULLEY ASSEMBLY
Install new oil seal and O-ring onto sliding pulley. Apply with specified grease to lubricate
the inside of sliding pulley.
Install sliding pulley onto driven pulley.
Install guide pin and guide pin roller.
Install oil socket.
Install driving belt, spring and clutch into
clutch spring compressor, and press down
the assembly by turning manual lever until
mounting nut that can be installed.
Hold the compressor by bench vise and
tighten the mounting nut to specified torque
with special nut wrench.
Remove the clutch spring compressor.
Torque value: 5.0~6.0 kg-m
Install clutch/driven pulley and driving belt
onto driving shaft.
8. V-BELT DRIVING SYSTEM/KICK STARTER ARM
Oil seal
O-ring
Sliding pulley
O-ring
Oil socket
Special nut wrench
Clutch spring compressor
Specified
grease
Guide pin
Oil seal
Guide pin
Guide pin
roller
8-13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aw12w-6

Table of Contents