Removal Of Electrical Box / Vertical Blades (Pattern 2) - Daikin FTK15JEVM Service Manual

Removal procedure 1.5/2.0/2.5/3.2/3.5/4.6 kw class 9000/12000 btu/h class
Table of Contents

Advertisement

Removal of Electrical Box / Vertical Blades (Pattern 2)

6. Removal of Electrical Box / Vertical Blades
(Pattern 2)
Procedure
Step
1. Disconnect the connecting
wires.
1
Remove the screw of
the service cover.
Pull out the service
2
cover down in the
direction of the arrow.
3
The figure shows the
connections of wire
harnesses.
Remove the screw of
4
the wire retaining plate.
12
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Terminal board
Indoor heat exchanger thermistor
Service cover
(R14600)
(R12042)
Electrical box
Wire retaining plate
(R14586)
(R12044)
Si041051
Points
Preparation
Remove the front grille
according to the "Removal
of Front Grille".
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents