Daikin FTK15JEVM Service Manual page 11

Removal procedure 1.5/2.0/2.5/3.2/3.5/4.6 kw class 9000/12000 btu/h class
Table of Contents

Advertisement

Si041051
Step
4
Remove the screw of
the wire retaining plate.
Remove the screws of
5
the terminal board and
disconnect the
connecting wires.
Pull out the indoor heat
6
exchanger thermistor.
2. Remove the electrical box.
Remove the screw and
1
release the earth /
ground wire.
Removal Procedure
Procedure
Terminal board
Indoor heat exchanger thermistor
Earth / ground
wire
Screw
Removal of Electrical Box / Vertical Blades (Pattern 1)
(R12044)
Connecting
wires
(R11639)
Clip
(R12045)
(R17334)
Points
Connecting wires
black (1) ----- power supply
white (2) ----- power supply
red (3) ----- transmission
yellow / green (
)
----- earth / ground
Take care not to lose the clip
of thermistor.
Thermistor
(R11268)
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents