Chapter 2 Getting Started; Unpacking The Subsystem - Fantom Drives MGD-16FC16S Installation Reference Manual

Raid fibre to s-ata/sas
Hide thumbs Also See for MGD-16FC16S:
Table of Contents

Advertisement

Chapter 2
Getting started with the subsystem consists of the following steps:
Unpack the storage subsystem.
Identifying Parts of the subsystem.
Connect the Fibre Cables.
Power on the subsystem.
Install Hard Drives.

2.1 Unpacking the Subsystem

Before continuing, first unpack the subsystem and verify that the contents of
the shipping carton are all there and in good condition. Before removing the
subsystem from the shipping carton, visually inspect the physical condition of
the shipping carton. Exterior damage to the shipping carton may indicate that
the contents of the carton are damaged. If any damage is found, do not re-
move the components; contact the dealer where the subsystem was pur-
chased for further instructions.
Getting Started
Getting Started
2-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mgd-16fc16a

Table of Contents