Powering-On The Subsystem - Fantom Drives MGD-16FC16S Installation Reference Manual

Raid fibre to s-ata/sas
Hide thumbs Also See for MGD-16FC16S:
Table of Contents

Advertisement

2.4 Powering-on the Subsystem

When you connect the Disk Array to the Host computer, you should press the
ON/OFF Power Supply Switch on both of the power supply units. It will turn
the Disk Array on and the Self-Test will be started automatically.
1.
Plug in all the power cords or power connectors located at the rear of the
subsystem.
Note:
!
The subsystem is equipped with redundant PFC (power factor
correction), Full Range power supplies. The subsystem will auto-
matically selector voltage.
2.
Turn on the power.
3.
The "Power" LED on the front panel will turn green. After a few moments
the LCD should display the following message: "
cable connect well.
2-10
Power 1 Switch
AC-1
{Model Name}
xxx.xxx.xxx.xxx
Getting Started
Power 2 Switch
AC-2
" detecting the Ethernet
*
*

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mgd-16fc16a

Table of Contents