Before You Start; Assembly - Shindaiwa EB221S Operator's Manual

Table of Contents

Advertisement

Available languages

Available languages

Before you start

Assembly

Read the operator's manual carefully to ensure that you assemble the product correctly.
Never perform maintenance or assembly procedures with engine running.
Using a product that has been incorrectly assembled could lead to an accident or serious injury.
Install blower pipes
1. Blower pipe
1. Blower pipe
Remove blower pipes
1. Blower pipe
WARNING
2. Blower discharge port
2. Nozzle
Before you start
Place the blower upright on the ground or on a sturdy work sur-
face.
1.
Grasp the blower pipe and push the pipe over the blower dis-
charge port.
2.
Lock the blower pipe to the blower discharge port by rotating
the pipe until a clicking sound is heard.
3.
Grasp the nozzle and then push the nozzle over the blower
pipe.
IMPORTANT
Do not operate the blower with only the blower pipe installed
and without the nozzle properly installed.
Do not install the the nozzle directly to the blower discharge
port.
4.
Lock the nozzle to the blower pipe by rotating the nozzle.
IMPORTANT
Blower pipe installation affects both blower balance and perfor-
mance.
1.
To detach the blower pipe, push the locking pin in and rotate
pipe anticlockwise. The hex wrench can be used.
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents