Before You Start; Assembly - Shindaiwa EB262 Operator's Manual

Hide thumbs Also See for EB262:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Before you start

Assembly

 Read the operator's manual carefully to ensure that you assemble the product correctly.
 Never perform maintenance or assembly procedures with engine running.
 Using a product that has been incorrectly assembled could lead to an accident or serious injury.
Install blower pipes
1. Blower pipe
1. Blower pipe
Remove blower pipes
WARNING
2. Round straight nozzle
or Flat straight nozzle
Before you start
1.
Stand unit upright on blower base.
2.
Align large locking ribs (A) on curved blower pipe with pipe
lock (B) in fan case. Slide curved blower pipe into fan case
until a clicking sound is heard.
 Do not assemble the opposite end of the curved blower pipe
to the fan case.
3.
Align tabs (C) with grooves (D) and slide the nozzle over the
blower pipe until there is light resistance. Do not force con-
nection.
4.
Hold the blower pipe, and turn the nozzle clockwise, engag-
ing positive locking channels until connection is firm. Do not
force connection.
NOTE
Blower use will eventually loosen pipe connections. Exclusive
positive locking system allows pipes to be tightened. If loosen-
ing occurs, remove the nozzle and install according to instruc-
tions 3 & 4.
1.
Insert screwdriver (E) into hole located near lock symbol (F)
to release pipe lock.
2.
Pull pipes out of fan cace.
3.
Remove screwdriver.
14

Advertisement

Table of Contents
loading

Table of Contents