Preparing For Installation Connections; Siting - Viessmann Vitocell 100-E Installation And Service Instructions For Contractors

Heating water buffer cylinder
Table of Contents

Advertisement

Preparing for installation
Connections
A
B
Fig. 1
Front
Thermometer sensor retainer
A
Max. 4 thermometers (TH, accessories)
B

Siting

!
Please note
To prevent material losses, site the DHW cylin-
der in a room free from the risk of frost and
draughts.
Otherwise the DHW cylinder must be drained
when not in use and there is a risk of frost.
Provide adequate clearance from the wall to allow for
operation of the temperature controller (if installed).
Placing the cylinder on a plinth will make the room
easier to clean.
6
A
B
C
D
Fig. 2
Back
Heating water flow 1 (HF 1)
A
B
Heating water flow 2 (HF 2)/heating water return
(HR 1)
Heating water return (HR 2)
C
Heating water return (HR 3)
D
Sensor well for thermometer sensor (TR 1)
E
Sensor well for thermometer sensor (TR 2)
F
Sensor well for thermometer sensor (TR 3)
G
Sensor well for thermometer sensor (TR 4)
H
A
E
B
F
C
G
D
H

Advertisement

Table of Contents
loading

This manual is also suitable for:

Svpa

Table of Contents