Installation
!
Please note
The thermal insulation must not come into con-
tact with naked flames.
Exercise caution when welding and brazing.

Levelling the heating water buffer cylinder

Note
Seal connections that are not required with caps.
1.
A
2.
B
Fig. 3
Type plate
A
3 adjustable feet
B
3. Insert the adjustable feet into the legs as far as they
will go. Use the adjustable feet to level the cylinder.
Note
Never extend the adjustable feet beyond a total
length of 30 mm.
4.
3.
3x
Installation sequence