Final procedures
Mounting the front cover onto the generator
3
Fig. 4 Mounting the front cover
1. Fit the front cover (3) to the generator and fasten it with sixteen screws (2).
2. Press on the outer cover strip (1).
NOTICE
Final protective grounding resistance test
Using the protective ground wire tester, measure the resistance between the mains
grounding connection (incl mains cable) and any metallic part of the stand and generator
which the patient/operator may come in contact with.
The protective ground resistance must not exceed 0.2
Siemens AG
Medical Solutions
When attaching the front cover, make sure that all eight contact
washers (four on either side) are used again as in the original
assembly (under the screws with clearance holes in the plastic
strips).
The screws must be securely tightened and the washers must be
functional. This is necessary to establish protective ground con-
nection.
Register 3
SPB7-230.033.11
Rev. 06
2
4
0
2
0
0
M
A
1
M
Ω
.
Page 5 of 10
05.06
CS PS SP
20 - 5
20
20
M1000/3000 Nova
Installation and Start-Up