Operation Check; Checking The Network; Checking Input Signals - Panasonic GM1 User Manual

Motion controller
Hide thumbs Also See for GM1:
Table of Contents

Advertisement

12.3 Operation Check

12.3.1 Checking the Network

After turning ON the power supplies, check if the operation monitor LEDs of the GM1 Controller
are in the following states.
● STATUS: Lit
● LINK: Lit
● If the "STATUS" LED is flashing, the network is not established.
● If the "LINK" LED is not lit, the "RX" (reception side) of the GM1 Controller and "TX"
(transmission side) of the servo amplifier are not electrically connected normally.

12.3.2 Checking Input Signals

Check the input of the over limit switch for the safety circuit connected to the servo amplifier
and the input of the near home (DOG) switch.
Check whether signal inputs are properly loaded into the GM1 Controller, with each switch
operated forcibly.
The input state of each switch can be checked on the monitor screen of the MINAS Series
Setup Support Software "PANATERM Lite for GM".
● If the operating direction of the motor is opposite to the position of the limits (+) and (-) after the
installation of the over limit switch, check the physical connection of the limit switch.
WUME-GM1RTXSU-01

12.3 Operation Check

12-7

Advertisement

Table of Contents
loading

Table of Contents