Follett HCE/HME700A Operation And Service Manua page 22

Table of Contents

Advertisement

6. Install the reservoir insulation, tube clamp, and
solenoid lever with three screws.
7.
Install solenoid.
1. Remove and inspect O ring seal. Replace if
damaged in any way (Fig. 25.1).
2. Clean O ring groove. Lubricate O ring with petrol-gel
and reinstall (Fig. 25.2).
3. Use cardboard disc to press new mating ring into
main housing (Fig. 26.1).
4. Lube the shaft with liquid soap in the area shown
(Fig. 26.2) and slip on seal and spring (Fig. 26.3).
Note: Do not touch the sealing surfaces with bare
hands. Contact with bare skin will cause
premature seal failure.
5. Install auger (Fig. 26.4).
Fig. 24
Fig. 25
2
Fig. 26
Cardboard
disc
Do NOT
touch!
3
22
1
1
2
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hce/hme700w

Table of Contents