Trane TRACER SUMMIT Hardware And Software Installation page 149

Hide thumbs Also See for TRACER SUMMIT:
Table of Contents

Advertisement

installation procedures, 99
multiple sites on a single shared
network, 102
overview of network, 96
preinstallation, 99
programming the site, 99
setting up broadcast distribution
table (BDT), 102
special situations, 102
system checkout, 101
IRQ, definition of, 131
L
LAN
definition of, 131
wiring, 89
LCI (LonTalk communication
interface) description, 65
LCP
definition of, 131
LCP (lighting control panel)
addressing, 65
description, 65
wiring, 65
LED
definition of, 131
LEDs
BCU reset procedures, 120
clear code, database, RAM, and
reset procedure, 121
clear Comm5 database, 122
clear database, RAM, and reset
procedure, 121
clear RAM and reset procedure,
120
codes for UCM communication
status, 116
codes interpreted, 118
for Ethernet communication
status, 118
for UCM communication status,
116
indicators for BCU communication
status, 115
locations on BCU logic board, 117
seven-segment display codes, 115,
118
startup sequence for new BCU,
119
startup sequence for programmed
BCU, 119
light emitting diode (LED), definition
of, 131
local area network (LAN)
definition of, 131
location for mounting the BCU, 17
LonMark profiles
Discharge Air Controller (DAC), 75,
76
BMTX-SVN01C-EN
Space Comfort Controller (SCC),
75, 76
LonTalk
Comm5, 56
definition of, 131
M
Microsoft
Internet Explorer, version
requirements, 6
Windows, version requirements, 6
mini-monitor, 3
minimum clearances for BCU, 19
model number, 10
modem
definition of, 131
see
BCU modem
see
MP501,
Tracer M501 controller
see
MP503,
Tracer MP503 I/O module
see
MP580/581
Tracer MP580/581
N
network wiring
ARCNET/Ethernet router, 97
communication, 89
connecting dedicated Ethernet to
IP , 96, 97
fiber optics, 92
shared Tracer Summit, 96
Neuron ID, 57
NMR, definition of, 131
O
operating environment, 17
see
optical-link loss,
decibel loss
P
PC Workstation
definition, 132
installation package, 7
modem, 5
requirements, 6
PCM
definition of, 132
PCM (programmable control
module)
addressing, 70
description, 70
wiring, 70
plenum-rated cable, 91
power, high-voltage requirements,
18
R
RAM, definition of, 132
remote communication
baud rate supported by BCU, 5
protocol, 5
requirements and specifications, 5
repeater
Comm5 wiring, 46, 48
requirements
high-voltage power, 18
operating environment, 17
resistance termination
Comm3, 39
Comm5, 48
router
ARCNET/Ethernet, 97
BACnet/IP , 103
dedicated Ethernet to IP , 96
RTA-RTW
addressing, 71
description, 71
wiring, 71
S
SCC, definition of, 132
scroll chiller
addressing, 72
description, 72
Trane Europe chiller, 77
wiring, 72
shielded wire for Comm5, 47
see
SNVT,
standard network variable
type
software requirements, 6
Space Comfort Controller (SCC)
profile, 75
specifications
high-voltage power requirements,
18
humidity, 18
operating environment, 17
temperature, 18
weight of BCU, 18
standard network variable type
(SNVT)
definition of, 132
discussion, 62
see
system,
Tracer Summit
T
TCM
definition of, 132
TCM (thermostat control module)
addressing, 73
description, 73
Index
137

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents