Download Print this page

Kohler VEIL K-5402A-0 Installation Instructions Manual page 23

Wall hung intelligent toilet
Hide thumbs Also See for VEIL K-5402A-0:

Advertisement

NOTE: Use suitable mounting methods for the wall construction material. Special fixings may be required for
walls made of plasterboard.
NOTE: Do not install this appliance in positions where it might come in contact with water.
1. Select a proper position for the control docking station to be installed. The position shall be easily operated by
the user when seated on the toilet.
2. Based on the docking station hole positions, drill two 6mm diameter holes, 45mm deep.
3. Insert lag bolt anchors into the holes.
4. Remove the double-sided tape and place docking station over the fixing holes.
5. Fasten docking station with screws and place bushing on the bolts.
6. Place remote control on the docking station.
F ig .#51
Kohler Co.
March 2016
23
1266554-A02-A

Advertisement

loading

This manual is also suitable for:

K-5402a-0