Unit Start-Up Checklist - Bryant 580J*08--14D Service And Maintenance Instructions

(2-compressor) nominal 7.5 to 12.5 tons with puron (r-410a) refrigerant
Table of Contents

Advertisement

I. PRELIMINARY INFORMATION:
MODEL NO.:
DATE:
II. PRE-START-UP (insert check mark in box as each item is completed):
VERIFY THAT ALL PACKAGING MATERIALS HAVE BEEN REMOVED FROM UNIT
j
VERIFY THAT CONDENSATE CONNECTION IS INSTALLED PER INSTALLATION INSTRUCTIONS
j
VERIFY THAT FLUE HOOD IS INSTALLED
j
CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
j
CHECK TO ENSURE NO WIRES ARE TOUCHING REFRIGERANT TUBING OR SHARP EDGES
j
CHECK GAS PIPING FOR LEAKS
j
CHECK THAT RETURN- -AIR FILTER IS CLEAN AND IN PLACE
j
VERIFY THAT UNIT INSTALLATION IS LEVEL
j
CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND VERIFY SETSCREW IS TIGHT
j
VERIFY PULLEY ALIGNMENT AND BELT TENSION ARE CORRECT
j
III. START-UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR 1
COMPRESSOR 2
INDOOR FAN AMPS
TEMPERATURES
OUTDOOR-AIR TEMPERATURE
RETURN-AIR TEMPERATURE
COOLING SUPPLY AIR
GAS HEAT SUPPLY AIR
PRESSURES
GAS INLET PRESSURE
GAS MANIFOLD PRESSURE
REFRIGERANT SUCTION
REFRIGERANT DISCHARGE
VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
j
VERIFY THAT 3- -PHASE SCROLL COMPRESSORS ARE ROTATING IN CORRECT DIRECTION
j

UNIT START-UP CHECKLIST

______________
L1-L2
L2-L3
L1
L2
L1
L2
L1
L2
DB
DB
DB
DB
IN. WG
IN. WG (LOW FIRE)
CIR 1
PSIG
PSIG
CIR 2
PSIG
CIR 1
CIR 2
PSIG
SERIAL NO: _____________________________________
TECHNICIAN: ___________________________________
BUILDING LOCATION:____________________________
L3-L1
L2
L2
L2
WB
WB
WB
IN. WG (HI FIRE)
TEMP _F
TEMP _F
TEMP _F
TEMP _F
85

Advertisement

Table of Contents
loading

This manual is also suitable for:

580j*08-14f

Table of Contents