Bryant 580J*08--14D Service And Maintenance Instructions page 27

(2-compressor) nominal 7.5 to 12.5 tons with puron (r-410a) refrigerant
Table of Contents

Advertisement

WIND CAP
ASSEMBLY
(SHOWN
INVERTED,
AS SHIPPED)
Burners and Igniters
CAUTION
!
EQUIPMENT DAMAGE HAZARD
Failure to follow this caution may result in
equipment damage.
When working on gas train, do not hit or plug
orifice spuds.
Main Burners
To access burners, remove burner access panel and slide
out burner partition. At the beginning of each heating
season, inspect for deterioration or blockage due to
corrosion or other causes. Observe the main burner flames
and adjust, if necessary.
Orifice Projection
Refer to Fig. 35 for maximum projection dimension for
orifice face to manifold tube.
SEAL STRIPS,
SPONGE RUBBER
REGULATOR
GASKET
REGULATOR
RETAINER
INDUCER FAN-MOTOR ASSEMBLY
BURNER ASSEMBLY
Fig. 34 - - Heat Exchanger Assembly
HEATER TUBE
ASSEMBLY
SUPPORT INSULATION ASSEMBLY
1.00-in
(25.4 mm)
MANIFOLD
PIPE
Fig. 35 - - Orifice Projection
Removal and Replacement of Gas Train
See Fig. 30, 34, and 36.
1. Shut off manual gas valve.
2. Shut off power to unit.
3. Slide out burner partition.
4. Disconnect gas piping at unit gas valve.
5. Remove wires connected to gas valve. Mark each
wire.
27
C08227
ORIFICE
C08211

Advertisement

Table of Contents
loading

This manual is also suitable for:

580j*08-14f

Table of Contents