Installer's Final Checklist - Capital Performance Series PSQ30RBI Use And Care Manual

Performance series
Hide thumbs Also See for Performance Series PSQ30RBI:
Table of Contents

Advertisement

final checklist
installer: initial beside each item
specified clearances maintained
nylon straps removed from burners
all internal packaging removed
knobs turn freely and all bezels are centered
each burner lights individually or with adjacent burner lit
air shutter adjustments made to all burners
igniter clicks when pressed and spark is visible from igniter tip
adjustable LO setting is satisfactory
drip pan is in place and rolling freely
pressure regulator is connected and set for 4.0" W.C. Nat.
or 10" W.C. L.P.
manual shut off valve installed and accessible
unit tested and free of leaks
side shelves are level (cart models only)
cart drawers open and close freely (cart models only)
lid sits on front ledge evenly
user informed of gas Supply shut-off location
radiant trays and grill racks securely in place
lights functional
rotisserie motor in place and plugged in
rotisserie rod totating freely when motor is turned ON
side burner grates in place
CUSTOMER: Ensure that installer completes checklist,
explains each item before leaving. Please make sure the
installer initials above and signs in the space provided.
28
INSTALLER: Please sign and date
here and leave these instructions
with customer:
X
date: ________________

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents