Panasonic Urban Multi MX1 Series Manual page 41

Hide thumbs Also See for Urban Multi MX1 Series:
Table of Contents

Advertisement

PACD011001G2 / PACD011004G3
1.
2.
<CAUTION>
CU-5MX / MC
CU-8 · 10MX / MC
Urban Multi Inverter "MX1" Series
Caution in installation
Execute the installation work by checking the foundation strength and levelness to avoid any
occurrence of vibration and noise.
Fix the unit tightly with foundation bolts.
(Prepare 4 sets of M12 foundation bolts with proper nuts and washers.)
The proper length of the foundation bolts form the surface of the base is 20mm.
The foundation must support the unit in the range above the shaped portion in the figure 1.
Remove the fitting (yellow color) for loading as shown in the figure 2.
Tighten the installation bolt of compressor firmly again.
2 fittings are attached to the front side of a single compressor.
Install the unit securely in case of earthquake an typhoon, cyclone, hurricane or other strong wind. The
unit may topple or cause another accident if improperly set up.
Pay special attention to the drainage in the environment of the unit by providing the drainage ditch in the
environment of the foundation.
Be sure to provide the waterproofing work in particular by paying attention to the floor strength if the unit
is installed on the rooftop.
Installation 1
41

Advertisement

Table of Contents
loading

Table of Contents